Decision details

Proposed Controlled Parking Zones in St Leonard’s and Streatham Vale (Stage 1 Consultation results)

Decision Maker: Assistant Director, Parking, Street Management and Commercial, Environment and Streetscene

Decision status: Recommendations Approved

Is Key decision?: No

Is subject to call in?: No

Decision:

1.            To undertake statutory consultation on the following proposed traffic orders, as illustrated as Appendix A to this report:

a)    a new controlled parking zone “St Leonard’s North (Zone I)” with controlled hours 12.00noon-2pm Monday-Friday across an area bounded by Prentis Road, Streatham High Road, Drewstead Road, the borough boundary and Garrad’s Road. Pay by Phone facility to operate with a 1-hour maximum stay and no return within 1 hour.

b)      a new controlled parking zone “St Leonard’s Central (Zone O)” with controlled hours 8.30am-6.30pm Monday-Friday across an area bounded by Streatham High Road, Tooting Bec Gardens, the Tooting-to-Streatham railway line and the Wandsworth borough boundary. Pay by Phone facility to operate with a 4-hour maximum stay and no return within 1 hour.

c)      a new controlled parking zone “Stanthorpe Triangle (Zone U)” with controlled hours 12.00noon-2pm Monday-Friday across an area bounded by Streatham High Road, Shrubbery Road, Gleneldon Road (to the railway bridge) and the Streatham-to-Tulse Hill railway line. Pay by Phone facility to operate with a 1-hour maximum stay and no return within 1 hour.

 

2.            To undertake statutory consultation on proposed traffic orders, to introduce “at any time” (double yellow line) waiting restrictions at the locations in the “St Leonard’s South” and “Streatham Vale West” zones illustrated in Appendix B to this report.

 

3.            That material objections resulting from the above statutory consultation are considered by way of a separate officer delegated decision report, in consultation with the Deputy Leader of the Council (Sustainable Transport, Environment and Clean Air) before any decision is made whether to implement, amend or withdraw the proposal.

 

Publication date: 15/04/2021

Date of decision: 23/04/2021

Accompanying Documents: